Technical & Engineering

Distributed Control System (DCS)

Distributed Control System (DCS) Hotel Ibis, Yogyakarta | 13 – 15 Maret 2013 | Rp 5.500.000,- Per Peserta Hotel Ibis, Yogyakarta | 18 – 20 Maret 2013 | Rp 5.500.000,- Per Peserta Hotel Ibis, Yogyakarta | 25 – 27 Maret 2013 | Rp 5.500.000,- Per Peserta Hotel Ibis, Yogyakarta | 01 – 03 April 2013 | Rp 5.500.000,- Per […]

PIPELINE RISK & INTEGRITY MANAGEMENT – Pasti Jalan

PIPELINE RISK & INTEGRITY MANAGEMENT Bandung | 1 – 3 April 2013 | Rp 6.500.000/person – Pasti Jalan Bandung | 13 – 15 May 2013 | Rp 6.500.000/person Bandung | 24 – 26 June 2013 | Rp 6.500.000/person Bandung | 26 – 28 August 2013 | Rp 6.500.000/person Bandung | 7 – 9 October 2013 | Rp 6.500.000/person Bandung | 25 – 27 November […]

ARTIFICIAL LIFT SYSTEM

ARTIFICIAL LIFT SYSTEM Hotel Grand Preanger, Bandung | 20 – 22 Agustus  2013  | IDR  9.750.000,- Hotel Grand Preanger, Bandung | 6 – 8 November 2013   | IDR  9.750.000,-     SASARAN BELAJAR : Setelah menyelesaikan kursus ini diharapkan peserta dapat : Memahami prinsip-prinsip dasar perhitungan reservoir minyak bumi yang berhubungan dengan penggunaan gas-lift, sucker-rod, electric submersible, hydraulic […]

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING Hotel Horison, Bandung | 28 – 30 Agustus  2013 | IDR  9.750.000,- /Participant  Hotel Horison, Bandung | 12 – 14 November 2013 | IDR  9.750.000,- /Participant    SASARAN BELAJAR : Setelah menyelesaikan kursus ini diharapkan peserta dapat : Memahami prinsip-prinsip dasar perhitungan reservoir minyak bumi yang berhubungan dengan penggunaan gas-lift, […]

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM Hotel grand serela,  Bandung | 20 – 22  Maret 2013 | IDR  9.000.000 Hotel grand serela,  Bandung | 9 – 11 April  2013  | IDR  9.000.000     SASARAN BELAJAR : Setelah menyelesaikan kursus ini diharapkan peserta dapat :   Memahami prinsip-prinsip dasar perhitungan reservoir minyak bumi yang berhubungan […]

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM Hotel grand serela,  Bandung | 20 – 22  Maret   2013 | IDR  9.000.000,- /Participant Hotel grand serela,  Bandung |  9 – 11 April  2013 | IDR  9.000.000,- /Participant       SASARAN BELAJAR : Setelah menyelesaikan kursus ini diharapkan peserta dapat :  Memahami prinsip-prinsip dasar perhitungan […]

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM Bandung | 13 – 16 March 2013 | Rp 7.750.000/person Bandung | 17 – 20 April 2013 | Rp 7.750.000/person Bandung | 29 May – 1June 2013 | Rp 7.750.000/person Bandung | 8 – 11 July 2013 | Rp 7.750.000/person Bandung | 4 – 7 September 2013 | Rp 7.750.000/person Bandung | 7 […]

ELECTRIC SUBMERSIBLE PUMPING

ELECTRIC SUBMERSIBLE PUMPING Hotel Hyatt, Bandung | 29 – 31 Mei 2013 | IDR  10.750.000,- Hotel Hyatt, Bandung | 19 – 21 November 2013 | IDR  10.750.000,-   Summary This course is to summarize the state of the art of Electric Submersible Pump (ESP) technology. It included the example problems to illustrate the use of various theoretical solutions, it also listed an […]

BUILDING MAINTENANCE

BUILDING MAINTENANCE Bandung | 9 – 11 April 2013 | Rp 5.500.000/peserta  Bandung | 15 – 17 May 2013 | Rp 5.500.000/peserta  Bandung | 19 – 21 June 2013 | Rp 5.500.000/peserta  Bandung | 23 – 25 July 2013 | Rp 5.500.000/peserta  Bandung | 18 – 20 September 2013 | Rp 5.500.000/peserta  Bandung | 28 – 30 October 2013 | Rp 5.500.000/peserta  Bandung | 4 – 6 […]

BELT CONVEYOR: TECHNOLOGY, DESIGN CALCULATING & TROUBLESHOOTING

BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATING & TROUBLESHOOTING Hotel Ibis, Yogyakarta |  18 – 21 Maret 2013 | Rp. 7.000.000,-    DESKRIPSI Belt conveyor memegang peranan penting dalam system transportasi bulk material seperti: batubara, semen, pupuk, pasir, belerang dan lain-lain. Hal ini disebabkan beberapa kelebihan yang dimiliki oleh belt conveyor dibanding dengan system transportasi lainnya. Belt conveyor […]